NEC×Electrical

NEC Electrical Compliance Check

AI-powered National Electrical Code (NFPA 70) compliance checking for electrical construction drawings. Detect violations, missing requirements, and code compliance issues before they delay your permit or hit the field.

About National Electrical Code (NFPA 70)

The US standard for electrical installations including wiring, overcurrent protection, grounding, and equipment. Adopted by most jurisdictions as the basis for electrical code enforcement.

Scope

Electrical installations in all building types

Editions

2023 NEC, 2020, 2017, 2014

Applicability

Adopted in nearly all US jurisdictions. Some states lag by one or two editions.

What We Check For

Branch circuit sizing and overcurrent protection per NEC Article 210
Feeder and service calculations per NEC Articles 215, 220, 230
Working clearances per NEC 110.26 for all electrical equipment
Grounding and bonding per NEC Article 250
GFCI and AFCI protection requirements per NEC 210.8, 210.12
Emergency systems per NEC Article 700 and legally required standby per Article 701

Common Electrical Issues We Catch

Electrical power distribution, lighting, fire alarm, low-voltage, and communications drawings.

!
Panel schedule circuit count and load calculation errors
!
Working clearance violations at electrical equipment (NEC 110.26)
!
Missing arc flash labels and hazard analysis
!
Grounding and bonding continuity gaps
!
Emergency/standby power system sizing errors
!
Fire alarm device spacing and coverage gaps
!
Lighting power density exceedances

Why NEC Electrical Compliance Matters

National Electrical Code (NFPA 70) compliance for electrical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching NEC electrical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Articulate Checks NEC Compliance

1

Upload Your PDF Drawings

Upload your electrical PDF drawings. No BIM models or 3D software required — Articulate works with the 2D PDFs your team already uses.

2

Purpose-Built Construction AI

Articulate's AI is trained specifically to review construction drawings against NEC requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact Issue Locations

Every NEC compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-Click RFI Generation

Turn detected NEC issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related Resources

NEC Checks for Other Disciplines

Electrical Checks Against Other Codes

Check Your Electrical Drawings Against NEC

Upload your PDF drawings and our AI will check them for National Electrical Code (NFPA 70) compliance — automatically.