Title 24×Electrical

Title 24 Electrical Compliance Check

AI-powered California Title 24 Energy Code (Part 6) compliance checking for electrical construction drawings. Detect violations, missing requirements, and code compliance issues before they delay your permit or hit the field.

About California Title 24 Energy Code (Part 6)

California's Building Energy Efficiency Standards — the most stringent energy code in the US. Covers building envelope, HVAC, lighting, and solar-ready requirements. All-electric requirements for many building types since 2023.

Scope

Energy efficiency for all new construction and major renovations in California

Editions

2022 Title 24 Part 6 (current), 2019

Applicability

Mandatory for all construction in California. Exceeds IECC requirements significantly. National influence on energy code development.

What We Check For

Title 24 compliance checking for electrical drawings
Cross-reference electrical details against California Title 24 Energy Code (Part 6) requirements
Verify electrical specifications meet Title 24 minimum standards
Check electrical coordination against Title 24 referenced standards
Identify electrical issues that could cause Title 24 compliance failures
Review electrical drawings for common Title 24 violations

Common Electrical Issues We Catch

Electrical power distribution, lighting, fire alarm, low-voltage, and communications drawings.

!
Panel schedule circuit count and load calculation errors
!
Working clearance violations at electrical equipment (NEC 110.26)
!
Missing arc flash labels and hazard analysis
!
Grounding and bonding continuity gaps
!
Emergency/standby power system sizing errors
!
Fire alarm device spacing and coverage gaps
!
Lighting power density exceedances

Why Title 24 Electrical Compliance Matters

California Title 24 Energy Code (Part 6) compliance for electrical drawings is critical because violations discovered during plan review delay permits, and issues found during construction result in costly rework, change orders, and schedule delays. Catching Title 24 electrical issues during preconstruction costs 10x less than fixing them in the field (CII, 1-10-100 Rule).

How Articulate Checks Title 24 Compliance

1

Upload Your PDF Drawings

Upload your electrical PDF drawings. No BIM models or 3D software required — Articulate works with the 2D PDFs your team already uses.

2

Purpose-Built Construction AI

Articulate's AI is trained specifically to review construction drawings against Title 24 requirements. Domain-specific training catches issues that generic AI tools miss.

3

Exact Issue Locations

Every Title 24 compliance issue is tagged with the exact page and coordinates on your drawings, plus severity ratings (high, medium, low) so you can prioritize.

4

One-Click RFI Generation

Turn detected Title 24 issues into formatted RFIs with a single click. Push directly to Procore with issue details, code references, and page locations.

Related Resources

Title 24 Checks for Other Disciplines

Electrical Checks Against Other Codes

Check Your Electrical Drawings Against Title 24

Upload your PDF drawings and our AI will check them for California Title 24 Energy Code (Part 6) compliance — automatically.