AI Pre-Permit Review for Architects

Review construction drawings for code compliance and coordination issues before submitting for permit, reducing plan check comments and approval time. Designed for the way architects work.

Schedule a Demo

The Challenges Architects Face

1

Catching cross-discipline coordination errors before IFC

2

Meeting building code requirements across multiple jurisdictions

3

Reducing E&O exposure from drawing errors

4

Managing quality across large drawing sets with tight deadlines

5

Responding to RFIs that stem from drawing ambiguities

How Articulate Helps

Fewer Plan Check Comments

Catch code compliance issues before the building department does. Reduce correction notices and re-submittals that delay your permit.

Protect Your Professional Liability

Every issue caught before permit reduces E&O exposure. Document that you performed thorough quality checks on your documents.

Multi-Code Compliance

Check against IBC, ADA, fire codes, energy codes, and local amendments simultaneously — not just the codes you remember to check.

Faster Permit Approval

Clean submittals get approved faster. Reduce the back-and-forth that turns a 6-week plan check into a 16-week ordeal.

Example Issues Articulate Catches

Real-world issues detected by AI analysis, relevant to architects doing pre-permit drawing review:

Egress width deficiency: corridor narrows to 38" at column enclosure (44" min required per IBC 1005.1)

Fire rating discontinuity: 2-hour fire wall terminates at ceiling — no extension to deck above shown in detail

Door schedule conflict: door D-107 shown as 3'-0" on plan but 2'-10" in door schedule

ADA violation: restroom grab bar mounting height shown at 36" AFF (should be 33-36" per ADA 604.5)

Missing information: stair pressurization not shown for required smokeproof enclosure per IBC 909

Key Features

Purpose-built construction AI tailored for architect pre-permit drawing review workflows

2D PDF analysis — no BIM models or 3D software required

10 issue categories covering coordination, code compliance, missing info, and more

Exact page locations and severity ratings (high/medium/low) for every issue

One-click RFI generation with Procore integration

Building code compliance checking (IBC, IRC, ADA, NEC, NFPA, and local codes)

Cross-discipline coordination between architectural, structural, MEP, civil, and fire protection

Drawing revision comparison to catch unclouded changes

When to Use Pre-Permit Review

Before submitting drawings to the building department for permit. Typically at the 90-100% CD phase.

Other Use Cases for Architects

Pre-Permit Review for Other Roles

Ready to Try AI Pre-Permit Review?

See how Articulate catches the issues that matter most to architects. Upload your drawings for a free analysis.