AI Pre-Permit Review for Architects
Review construction drawings for code compliance and coordination issues before submitting for permit, reducing plan check comments and approval time. Designed for the way architects work.
Schedule a DemoThe Challenges Architects Face
Catching cross-discipline coordination errors before IFC
Meeting building code requirements across multiple jurisdictions
Reducing E&O exposure from drawing errors
Managing quality across large drawing sets with tight deadlines
Responding to RFIs that stem from drawing ambiguities
How Articulate Helps
Fewer Plan Check Comments
Catch code compliance issues before the building department does. Reduce correction notices and re-submittals that delay your permit.
Protect Your Professional Liability
Every issue caught before permit reduces E&O exposure. Document that you performed thorough quality checks on your documents.
Multi-Code Compliance
Check against IBC, ADA, fire codes, energy codes, and local amendments simultaneously — not just the codes you remember to check.
Faster Permit Approval
Clean submittals get approved faster. Reduce the back-and-forth that turns a 6-week plan check into a 16-week ordeal.
Example Issues Articulate Catches
Real-world issues detected by AI analysis, relevant to architects doing pre-permit drawing review:
Egress width deficiency: corridor narrows to 38" at column enclosure (44" min required per IBC 1005.1)
Fire rating discontinuity: 2-hour fire wall terminates at ceiling — no extension to deck above shown in detail
Door schedule conflict: door D-107 shown as 3'-0" on plan but 2'-10" in door schedule
ADA violation: restroom grab bar mounting height shown at 36" AFF (should be 33-36" per ADA 604.5)
Missing information: stair pressurization not shown for required smokeproof enclosure per IBC 909
Key Features
Purpose-built construction AI tailored for architect pre-permit drawing review workflows
2D PDF analysis — no BIM models or 3D software required
10 issue categories covering coordination, code compliance, missing info, and more
Exact page locations and severity ratings (high/medium/low) for every issue
One-click RFI generation with Procore integration
Building code compliance checking (IBC, IRC, ADA, NEC, NFPA, and local codes)
Cross-discipline coordination between architectural, structural, MEP, civil, and fire protection
Drawing revision comparison to catch unclouded changes
When to Use Pre-Permit Review
Before submitting drawings to the building department for permit. Typically at the 90-100% CD phase.
Other Use Cases for Architects
Pre-Permit Review for Other Roles
Ready to Try AI Pre-Permit Review?
See how Articulate catches the issues that matter most to architects. Upload your drawings for a free analysis.