A comprehensive checklist for reviewing construction documents before they reach the field
Quality control on construction drawings is one of the highest-ROI activities in project management. Every issue caught during plan review is an RFI avoided, a change order prevented, and a schedule delay eliminated. This checklist covers the critical categories that cause the most problems in the field.
1. Cross-Discipline Coordination
Cross-discipline coordination is the most common source of field issues. See our guide on finding clashes in 2D drawings for detailed techniques.
Structural grid lines match architectural grid lines Column locations consistent across all disciplines Floor elevations match between architectural and structural MEP clearances verified against structural elements Ceiling heights accommodate ductwork and piping Door swings clear of obstructions Equipment locations coordinated with structural supports 2. Dimensions and Measurements
Dimension strings add up correctly No conflicting dimensions between plans and details Scale noted on all drawings Critical clearances explicitly dimensioned Finish floor elevations noted Ceiling heights specified 3. Code Compliance
Code compliance items are often the costliest to fix after construction. Refer to our egress basics and fire rating guide for deeper dives.
Egress widths meet code requirements Exit signage locations shown Fire-rated assemblies clearly noted Accessible routes identified and compliant Plumbing fixture counts adequate for occupancy Handrail and guardrail heights specified Fire separation distances verified 4. Specifications and Notes
Material specifications complete Finish schedules match plan notations Hardware schedules complete Detail references valid and present Specification sections referenced correctly No conflicting notes on same drawing Legend symbols used consistently 5. Structural
Foundation plan matches architectural footprint Beam sizes and locations noted Column schedules complete Load-bearing walls identified Penetrations through structure coordinated Expansion joints located and detailed Connection details provided 6. MEP Systems
Electrical panel locations shown Plumbing fixture locations match architectural HVAC equipment sized appropriately Duct routing doesn't conflict with structure Fire sprinkler coverage adequate Utility connections located Equipment access and service clearances provided Automate 80% of This Checklist
Manual QA/QC review is thorough but time-consuming. Articulate's AI can automatically check your drawings against most items on this checklistâidentifying issues with exact locations on your PDFs in minutes instead of hours.
Focus your team's expertise on judgment calls while AI handles the systematic checking.
Try Automated QA/QC Free