Calculate the true cost of RFIs on your construction project. The average RFI costs $1,080 to process and takes 10–15 days to resolve (Navigant/CII).

Your Project Details

RFIs

Industry average: 100–300 per project

$

Navigant avg: $1,080 (staff time, review, response)

days

Industry average: 10–15 days

$

General conditions, overhead, equipment per day

%

CII estimates 30–50% of RFIs are preventable

Cost Impact

Total RFI processing cost
$162,000
150 RFIs × $1,080 each
Total delay days
1,800 days
150 RFIs × 12 days each
Total delay cost
$4,500,000
1,800 days × $2,500/day
Total RFI cost on this project
$4,662,000
Potential savings with early detection
$1,864,800
By catching 60 preventable RFIs during plan review instead of in the field

How This Calculator Works

This calculator uses the Construction Industry Institute (CII) 1-10-100 rule: a $1 issue caught in design costs $10 in construction and $100 in operations. Default values are based on:

  • $1,080 per RFI — Navigant Construction Forum™ study average processing cost
  • 10–15 day resolution — industry average turnaround including review cycles
  • 30–50% preventable — CII research on RFIs caused by drawing errors and missing information

Delay costs vary significantly by project size and type. Adjust the daily delay cost to match your project's general conditions rate.